EnveoPutz Silicon

SILICONE FINISHING PLASTER FOR DECORATION AND PROTECTION OF FACADE SURFACES
Read more
Read less
SILICONE FINISHING PLASTER FOR DECORATION AND PROTECTION OF FACADE SURFACES


Calculate your material consumption

 

 

Product description

EnveoPutz Silicon is a silicone finishing plaster intended for decoration and protection of facade surfaces. Owing to excellent elasticity and high water permeability it decreases the possibility of occurrence of micro-cracks on the facade and negative impact of moisture. It is available in a large number of tones in line with Enveo color fan.


Product classification

V2-W2-0,3Mpa-λ=0,82W/(m*K)-B-s2, d0

(EN 15824:2017)

Area of application

EnveoPutz Silicon is part of Enveo facade systems with EPS and stone wool. Tones with HBW index lower than 30% should be used only for smaller surfaces, such as borders on windows, doors and other openings.

 


Product benefits

Extreme elasticity of plaster

Excellent color stability

High water repellency

Technical description

Product color: EnveoPutz Silicon is a white facade plaster that can be toned in line with Enveo tone card.

Packages: plastic bucket 25 kg, 600 kg on the pallet.

Expiration date: 12 months from the production date pressed on the bucket.

Detailed information on product, additional documentation and safety data sheet are available on  the official webpage www.saint-gobain.rs.

Cleaning

Residue of fresh product can be cleaned from the tools and surfaces with water. Hardened product must be removed only mechanically.

Product limitations

Facade plaster EnveoPutz Silicon cannot be used in the following situations:

  • With wooden and metal surfaces
  • For application in several layers and over the existing finishing plaster
  • At temperatures for storage, transport, application and drying lower than +5˚C and higher than  30˚C
  • With surfaces containing impurities and moisture
  • On horizontal treading and roof surfaces

Preparation and application


Surface preparation

The base on which the product is applied on must be clean, solid, dry, without traces of oil and  grease, supported and without parts falling off. Plaster may be applied to surfaces based on lime and cement, previously treated with primer EnveoGrund. Cement-lime plasters and concretes must be at least one month old, with moisture residue of < 2%. Insufficiently supported coatings and parts that are falling off, coatings soluble in water (during surface washing) should be fully removed and repaired with appropriate material. Surfaces contaminated with mold and algae should be washed with hot water and disinfected with appropriate products.


Product preparation and installation

  1. Minimum 24h before application of facade plaster the surface should be covered with basic primer EnveoGrund for the purpose of improving adhesion, regulation of water absorption, improvement of water permeability and open working time of the plaster. Primer must be toned in the same tone as the facade plaster.
  2. EnveoPutz Silicon should be well mixed before use to the bottom in each bucket individually, and afterwards, homogenize the material from different batches and/or packages in one large vessel for tone alignment (equalization). For the purpose of setting intended consistency of  plaster, as necessary, add a maximum of 250 ml of pure water at 25 kg of products. Subsequent adding of water and pigment is not allowed.
  3. Facade plaster is applied with steel trowel in the thickness of the largest grain. Properly applied plaster should be processed with PVC or metal trowel using light pressure on the surface of circular or straight movements depending on the structure and intended appearance.  Application and processing of plaster shall be performed in continuity for the surface to appear consistent. For successful performance, it is necessary to align the number of operators compared to the number of floors and surface, in order for the material joints to be developed  in wet condition and invisible after completion.
  4. Facade system must be secured with sills  to achieve full protection from penetration and drainage of water down the surface. Product should not be used on horizontal surfaces where impurities, water and snow may be retained.
  5. During installation and drying the temperature of the surface and air must be between 5°C and 30°C. Material should be protected from the impact of sun, wind and rain for at least 24h, after which period resistance is achieved to atmospheric impact. Recommended protection method includes setting scaffold screens, but it may be insufficient in case stated impact is of strong intensity. In case weather conditions do not match the requirements; it is necessary to stop the work and wait for the optimum conditions.

* All stated parameters refer to standard weather conditions: temperature 20°C, relative humidity up to 65%.

The manufacturer recommends application on small, test surfaces to make sure the product/surface are properly prepared and that appropriate conditions of use and installation are provided. If not, please stop the work and contact the representative of Saint-Gobain građevinski proizvodi d.o.o. Beograd. The company shall not be responsible for incorrect execution of works with the stated material as well as use of material for the purpose not stated in product description. Complaints submitted after the completion of execution of works shall not be accepted.

Tools

  • For mixing: electric mixer.
  • For application and leveling: Spatula, steel and plastic trowel, spatula.

Product consumption

Approximately 2.5-3.5 kg/m2 depending on granulation and type of facade.

Documents

Related products

Contact us

Phone: +381 11 314 96 84

Your e-mail*
Your phone number*
Message*

 * required field

CAPTCHA